Walney Offshore Windfarm
Mermaid Maritime Consulting was aappointed by “Dong Renewable” to performed as "Offshore Installation Manager" to the foundation of Walney Offshore Wind Farm build out of Barrow in Furness, UK.
110 units of 3.2 MW turbines on mono piles was established on the seabed.
Mermaid Maritime Consulting was also involved the approval of contractor’s vessels and contracts.
Additionally we participated in the start-up process of Anholt Offshore Wind Farm project.
Rolling Stone
DP-II Fall Pipe Vessel
Pre entry – Survey alongside Port of Tuxpan, Mexico
14th December 2009
MPI RESOLUTION
WIND TURBINE INSTALLATION VESSEL, IMCA INSPECTION.
Vessel name: MPI RESOLUTION
Vessel owner Resolution Shipping Ltd.
IMO number: 9260134
Date inspected: 2nd August 2010
Class ID number DNV23494
Hull type Mono Hull, Self-Elevating installation vessel.
LOA 130.50 m.
Beam 38.00 m.
Maximum draft 5.00 m.
Deadweight tonnage 11461 metric tons
Gross tonnage 14085 Ton
Main engine horsepower and manufacturer 4 x Mitsubishi S16R-MPTK, each 1800 KW, 2 x Wartsila 6L20 1388 Kva.
Mermaid Maritime Consulting ApS
Naval Architect & Marine Engineer
– Steen Ravnborg
Nørrevej 64
DK-3070 Snekkersten
(+45) 20 49 18 58
Skype: sravnborg
On Site
Dry dockings, Pre-Purchase Inspection, Condition Survey, Independent Survey, New Building Supervision and ISM / ISPS audits, Superintendence.
Copyright @ All Rights Reserved Webmaster: Sandvaddesign.dk