DONG RENEWABLE

DONG Renewable

Walney Offshore Windfarm

Mermaid Maritime Consulting was aappointed by “Dong Renewable” to performed as "Offshore Installation Manager" to the foundation of Walney Offshore Wind Farm build out of Barrow in Furness, UK.
110 units of 3.2 MW turbines on mono piles was established on the seabed.
Mermaid Maritime Consulting was also involved the approval of contractor’s vessels and contracts.
Additionally we participated in the start-up process of Anholt Offshore Wind Farm project.

Rolling Stone

DP-II Fall Pipe Vessel

Pre entry – Survey alongside Port of Tuxpan, Mexico

14th December 2009

MPI RESOLUTION

WIND TURBINE INSTALLATION VESSEL, IMCA INSPECTION.

Vessel name: MPI RESOLUTION

Vessel owner Resolution Shipping Ltd.

IMO number: 9260134

Date inspected: 2nd August 2010

Class ID number DNV23494

Hull type Mono Hull, Self-Elevating installation vessel.

LOA 130.50 m.                         

Beam 38.00 m.

Maximum draft   5.00 m.                            

Deadweight tonnage 11461 metric tons

Gross tonnage 14085 Ton


Main engine horsepower and manufacturer 4 x Mitsubishi S16R-MPTK, each 1800 KW, 2 x Wartsila 6L20 1388 Kva.